Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/laubingerrickmann_595/public/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the uael domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/laubingerrickmann_595/public/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/laubingerrickmann_595/public/wp-includes/functions.php on line 6121

Laubinger + Rickmann

NEWS

50 years of L+R – for us a good reason to celebrate!

Deprecated: strtolower(): Passing null to parameter #1 ($string) of type string is deprecated in /www/laubingerrickmann_595/public/wp-content/plugins/elementor/includes/utils.php on line 727

Laubinger+Rickmann has been producing special machines since 1972 – today with a focus on non-destructive testing technology and straightening systems. During this time, we have had the chance to develop new things further and further with many renowned customers from the aviation, automotive, transportation (railway) and steel industry.

LEARN MORE
Expansion of our production facilities

We are expanding our production facilities by another assembly hall with a floor space of approximately 11,000 sqft. With this, we are increasing our capacity and can make our internal work processes significantly more efficient. Of course, the building will be designed according to the latest energy standards: Heating will be provided by a heat pump. In addition, the roof will be equipped with a 100kWp photovoltaic system, which can be expanded to an output of up to 400kWp.

LEARN MORE